A7 Highway – Ploiesti – Buzau

Highway Length: 63.25 km Overpasses: 40 Junctions: 6 Maintenance centers: 2 Parking-service spaces: 4 Status: Feasibility Study – finished Technical Project – in work https://consitrans.ro/wp-content/uploads/2021/03/consitrans-buzau-ploiesti.mp4 A7 Highway – Ploiesti – Buzau For this project we provided the analysis for the best highway positioning and layout, followed by the Feasibility Study and Technical project. Part of…

A3 Highway – City Connection Bucharest – Ploiesti

Lungime autostradă: 3.32 km Pasarele: 2 Intersecții: 3 Valoare totala lei: 129,180,727.51 RON Valoare totala euro: aproximativ 28,922,785 € Status: terminat Bucharest, Romania Providing Construction Supervision and Contract Management for the final section of the Bucharest-Ploiesti Highway, connecting the city of Bucharest to the already existing highway sections in order to facilitate highway access from…

A1 Highway Lugoj – Deva

Lungime autostradă: 28.6 km Pasarele: 9 Poduri: 2 Valoare totală – lei: 562,730,583.80 RON Valoare totală – euro: aproximativ 128,000,000 € Status: în lucru Western Romania Providing Construction Supervision and Contract Management services for 28.6 km, Section 2, to improve traffic flow for travel, tourism and commerce. The Lugoj – Deva highway is part of…

A3 Highway Bucuresti – Ploiesti

Lungime autostradă: 58.7 km Pasarele: 5 Poduri: 6 Valoare totala – lei: 11,147,101.40 RON Valoare totala – euro: aproximativ 2,495,489 € Status: finalizat Southern Romania Providing Construction Supervision and Contract Management services for 58.7 km, Sections 1 and 2, to improve traffic flow for tourism travel and commerce. The Bucharest – Brasov Highway is part…

Nadlac- Arad

A1 Highway Nadlac – Arad

Lungime autostradă: 38.88 km Pasarele: 11 Poduri: 2 Valoare totala lei: 337,748,248 RON Valoare totala euro: approximativ 75,274,298 € Status: terminat Western Romania Construction Supervision and Contract Management for 38.8 km of highway, connecting the border of Hungary to the rest of the country, improving travel and commerce. The Nadlac – Arad A1 highway is…

A1 Highway Orastie – Sibiu

Lungime autostradă: 82 km Pasarele: 26 Viaducte: 3 Valoare totala lei: 2,095,984,600 RON Valoare totala euro: aproximativ 467,134,235 € Status: terminat Central Romania Construction Supervision and Contract Management for 82 km of highway to improve traffic flow, reduce accidents and deaths by 80%, reduce environmental impact and improve travel and commerce. The Orastie – Sibiu…

A1 Highway Deva – Orastie

Lungime autostradă: 32.5 km Pasarele: 21 Accidente: – 60% Valoare totala – lei: 888,519,457.27 RON Valoare totala – euro: aproximativ 197,391,744 € Status: în execuție Hunedoara County, Western Romania Providing Construction Supervision and Contract Management services for a “Greenfield” bypass construction to decongest traffic, increase fluency, reduce environmental pollution and reduce accidents by 60% thereby…

Arad – Highway Bypass

Lungime autostradă: 12.25 km Pasarele: 9 Poduri: 3 Valoare totală – lei: 457,973,114 RON Valoare totală – euro: aproximativ 101,742,410 € Status: terminat Arad County, Western Romania Providing preliminary to final engineering design services for a TEN-T network highway portion which bypasses the city of Arad and is a connection point between the Nadlac –…

A1 Highway Timisoara – Lugoj

Lungime autostradă: 9.5 km Pasarele: 6 Poduri: 4 Valoare totala – lei: 210,369,462.74 RON Valoare totala – euro: aproximativ 47,047,784 € Status: finalizat Timis County, Western Romania Providing preliminary to final engineering design services for Section 1 of a TEN-T network highway, connecting western Romania to Hungary and the rest of the country to improve…