Arad – Highway Bypass

Lungime autostradă: 12.25 km Pasarele: 9 Poduri: 3 Valoare totală – lei: 457,973,114 RON Valoare totală – euro: aproximativ 101,742,410 € Status: terminat Arad County, Western Romania Providing preliminary to final engineering design services for a TEN-T network highway portion which bypasses the city of Arad and is a connection point between the Nadlac –…

A1 Highway Timisoara – Lugoj

Lungime autostradă: 9.5 km Pasarele: 6 Poduri: 4 Valoare totala – lei: 210,369,462.74 RON Valoare totala – euro: aproximativ 47,047,784 € Status: finalizat Timis County, Western Romania Providing preliminary to final engineering design services for Section 1 of a TEN-T network highway, connecting western Romania to Hungary and the rest of the country to improve…